Skip to main content

RKEC Projects Ltd

Stage 4 · Declining · week 45

RKEC Projects Limited, a construction company, engages in the civil and defense construction business in India. More about the company

₹20.9
-2.47% today
₹50 Cr · Micro cap
Market Neutral — FadingIndustrials 26.3% in Stage 2-4.2 pts / 20dConstruction & Engineering 17.2%-0.9 pts
Loading price chart…
vs 52W High
-71.7%
₹18.1 lo₹73.9 hi
71.7% below 52W high — deep Stage 4 damage
In Stage 4, distance from the 52W high reflects ongoing decline — not a discount. Avoid catching falling knives.
Stage Maturity
Week 45
1w13w26w
Week 45 — extended decline
How long this stock has been in Stage 4 decline. The longer the downtrend, the more entrenched the selling pressure — there's no 'bottom' time to buy.
vs 200 DMA
-39.2%
200 DMA: ₹34.4 · sloping down
In Stage 4, the stock is below its 200 DMA — the hallmark of a downtrend. No long positions warranted until this reverses structurally.
Rel Volume
0.37x
vs 50-day avg
High volume on down days in Stage 4 confirms institutional selling. Low volume bounces are typical — they lack real buyers and should not be mistaken for reversals.
Trend Health
→
MA20 flat · +0.4% vs MA50 -10.4%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-3.9%
3M
-21.9%
6M
-42.8%
YTD
-65.0%
1Y
-70.9%
Sector
Industrials
↓ Peaking
Stage 2%
26.3%
20d Δ
-4.2pp
1M return
-2.2%
3M return
+0.9%
Sector Stage-2 % · last 20 days
Sector has 130 Stage 2 leaders. See Industrials Stage 2 →
Industry
Construction & Engineering
→ Flat
Stage 2%
17.2%
20d Δ
-0.9pp
1M return
-6.0%
3M return
-6.3%
Industry Stage-2 % · last 20 days
Industry has 15 Stage 2 leaders. See Construction & Engineering Stage 2 →
Stage Cycle Timeline2023-07-12 → 2026-10-07
S2 38w
S4 21w
S4 46w
2023-07-122026-10-07
S1S2S3S4Setup score (0–10, dashed line at 5)
S3 6w → S2 38w → S3 7w → S2 13w → S3 2w → S2 5w → S3 5w → S4 21w → S1 10w → S4 12w → S1 4w → S4 46w current
Total tracked: 169 weeks across 12 stage runs.
Scan Membership
Breakout Watch
Latest: 2024-10-17
2 appearances in last 60 days. First seen: 2024-07-01.
Stocks that stay in the scan for 13+ weeks are in the highest observed-return cohort — they keep qualifying because the structure remains intact, not by luck. Persistence in the scan is itself a quality signal.
Recent Stage Timeline
2026-10-07S4
Wk 45 · Vol 0.37x
2026-10-06S4
Wk 45 · Vol 0.52x
2026-10-05S4
Wk 45 · Vol 0.47x
2026-10-01S4
Wk 45 · Vol 0.42x
2026-09-30S4
Wk 45 · Vol 3.69x
2026-09-29S4
Wk 44 · Vol 2.35x
2026-09-28S4
Wk 44 · Vol 2.47x
2026-09-25S4
Wk 44 · Vol 18.35x
2026-09-24S4
Wk 44 · Vol 6.25x
2026-09-23S4
Wk 44 · Vol 0.99x
2026-09-22S4
Wk 43 · Vol 0.52x
2026-09-21S4
Wk 43 · Vol 0.38x
Sector Peers — Stage 2All →
SPECTRUM
wk 18 · -0.3% from hi
10.0
ROSSTECH
wk 30 · 0.0% from hi
9.6
SHIVAUM
wk 27 · -1.4% from hi
9.4
AXISCADES
wk 2 · -2.7% from hi
9.2
SAMBHV
wk 9 · -4.0% from hi
9.0
Moving averages & range
50 DMA
₹22.7
200 DMA
₹34.4
52W High
₹73.9
52W Low
₹18.1
5D Low
₹20.9
Resistance levels (recent highs)
20d High
₹24.3
60d High
₹27.7
120d High
₹41.6
250d High
₹72.7
Next resistance
+16.1%
to 20d High
P/E (TTM)
3.8
Forward —
Earnings Growth (YoY)
-80.5%
Revenue -72.6%
ROE
+4.8%
Profit margin +3.4%
About this companyIndustrials· Construction & Engineering

RKEC Projects Limited, a construction company, engages in the civil and defense construction business in India. The company undertakes construction projects, such as bridges comprising major and minor bridges, steel and PSU girders, composite girders, and rail cum road bridges; and ports, dams, airports, cross-water, roads, highways, oil and gas pipelines, complexes, and environmental structures. It also provides marine structure services, including wharves, berths, jetties, mooring dolphins, intake structure breakwaters, and coastal-shore protection works. In addition, the company offers building and infrastructure works, which include civil works for power and refinery projects port development works; and transmission lines, sports complex, building works, water intake systems, heavy RCC pre-stressed concrete and steel structure, and farmed warehouse and industrial sheds, as well as electrification services comprising rural electrification and LT/HT works. The company was founded in 1985 and is based in Visakhapatnam, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-07. Past data patterns are not indicative of future results. This page is a data analytics tool only.