Skip to main content

Cemindia Projects Ltd

Stage 3 · Topping · week 3

Cemindia Projects Limited provides construction and civil engineering contracting services in India. More about the company

₹1,137.8
-1.90% today
₹19,546 Cr · Mid cap
Market Neutral — FadingIndustrials 26.3% in Stage 2-4.2 pts / 20dConstruction & Engineering 17.2%-0.9 pts
Loading price chart…
vs 52W High
-30.6%
₹509.7 lo₹1,639.6 hi
30.6% below 52W high — weakening from peak
Stock is rolling over from its 52W high. Stage 3 distribution — new longs are high risk here.
Stage Maturity
Week 3
1w13w26w
Week 3 — early distribution
How long this stock has been in Stage 3 distribution. Longer tops often precede deeper Stage 4 declines.
vs 200 DMA
17.7%
200 DMA: ₹966.6 · rising
Stock is losing its 200 DMA. Once lost, it confirms Stage 4 risk. This is a major red flag for existing holders.
Rel Volume
0.54x
vs 50-day avg
Volume spikes on down days during Stage 3 signal distribution — institutions are exiting. A clear warning to avoid new longs.
Trend Health
↓
MA20 rolling over · -2.3% vs MA50 -8.2%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-12.3%
3M
-23.6%
6M
+104.8%
YTD
+38.2%
1Y
+42.0%
Sector
Industrials
↓ Peaking
Stage 2%
26.3%
20d Δ
-4.2pp
1M return
-2.2%
3M return
+0.9%
Sector Stage-2 % · last 20 days
Sector has 130 Stage 2 leaders. See Industrials Stage 2 →
Industry
Construction & Engineering
→ Flat
Stage 2%
17.2%
20d Δ
-0.9pp
1M return
-6.0%
3M return
-6.3%
Industry Stage-2 % · last 20 days
Industry has 15 Stage 2 leaders. See Construction & Engineering Stage 2 →
Stage Cycle Timeline2025-09-10 → 2026-10-07
S? 42w
S2 10w
2025-09-102026-10-07
S1S2S3S4Setup score (0–10, dashed line at 5)
S? 42w → S2 10w → S3 3w current
Total tracked: 56 weeks across 3 stage runs.
Scan Membership
Breakout Watch
Latest: 2026-07-06
Stocks that stay in the scan for 13+ weeks are in the highest observed-return cohort — they keep qualifying because the structure remains intact, not by luck. Persistence in the scan is itself a quality signal.
Recent Stage Timeline
2026-10-07S3
Wk 3 · Vol 0.54x
2026-10-06S3
Wk 3 · Vol 0.35x
2026-10-05S3
Wk 3 · Vol 0.62x
2026-10-01S3
Wk 3 · Vol 0.56x
2026-09-30S3
Wk 2 · Vol 0.61x
2026-09-29S3
Wk 2 · Vol 0.29x
2026-09-28S3
Wk 2 · Vol 0.31x
2026-09-25S3
Wk 2 · Vol 0.26x
2026-09-24S3
Wk 2 · Vol 0.40x
2026-09-23S3
Wk 1 · Vol 0.44x
2026-09-22S3
Wk 1 · Vol 0.70x
2026-09-21S3
Wk 1 · Vol 0.19x
Sector Peers — Stage 2All →
SPECTRUM
wk 18 · -0.3% from hi
10.0
ROSSTECH
wk 30 · 0.0% from hi
9.6
SHIVAUM
wk 27 · -1.4% from hi
9.4
AXISCADES
wk 2 · -2.7% from hi
9.2
SAMBHV
wk 9 · -4.0% from hi
9.0
Moving averages & range
50 DMA
₹1,266.3
200 DMA
₹966.6
52W High
₹1,639.6
52W Low
₹509.7
5D Low
₹1,137.8
Resistance levels (recent highs)
20d High
₹1,319.3
60d High
₹1,639.6
120d High
₹1,639.6
250d High
₹1,639.6
Next resistance
+16.0%
to 20d High
P/E (TTM)
28.5
Forward 17.9
Earnings Growth (YoY)
+113.4%
Revenue +19.9%
ROE
+28.2%
Profit margin +5.9%
Dividend Yield
0.32%
P/B 7.1
About this companyIndustrials· Construction & Engineering

Cemindia Projects Limited provides construction and civil engineering contracting services in India. The company constructs maritime structures, including jetties, dolphins, service platforms, quay, berths on concrete and steel piles, solid gravity type wharf structures, ship lifts, dry docks, wet basins, and inclined berths; mass rapid transport systems (MRTs); airports; highways, bridges, and flyovers; foundations and specialized engineering works comprising geotechnical investigations, piling, diaphragm walling, slope stabilization, sandwicks/band drains, vibrofloatation stone columns, drilling and grouting, rock/soil anchors repairs, colcrete, gunite/shotcrete, grouted mattress, box pushing, tube heading, microtunneling, and rehabilitation and underpinning services; and dams and tunnels, TBM, M-TBM, NATM Tunnels, Box Pushing Tunnels. It also offers breakwater and piled approach trestles, steel piles and bored casts, undersea ground improvement, dredging and land reclamation, and coastal erosion protection and rock bund services, as well as foundation and specialist engineering services. In addition, the company engages in the civil works for refinery, petrochemical, power, steel, and fertilizer plants; design, construction, supply, installation, and commissioning of pipelines; operation of water and wastewater treatment plants, and pumping stations; and develops data center to cater to deliver cutting-edge, integrated solutions tailored to critical sectors. It serves the state and central government departments, ministries, local municipal bodies, and private clients. The company was formerly known as ITD Cementation India Limited and changed its name to Cemindia Projects Limited in August 2025. Cemindia Projects Limited was founded in 1931 and is based in Mumbai, India. As of August 8, 2025, Cemindia Projects Limited operates as a subsidiary of Renew Exim DMCC.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-07. Past data patterns are not indicative of future results. This page is a data analytics tool only.