Skip to main content

Power Mech Projects Ltd

Stage 3 · Topping · week 6

Power Mech Projects Limited, together with its subsidiaries, provides services in power and infrastructure sectors in India and internationally. More about the company

₹2,429.3
+0.14% today
₹7,681 Cr · Mid cap
Market Neutral — FadingIndustrials 26.3% in Stage 2-4.2 pts / 20dConstruction & Engineering 17.2%-0.9 pts
Loading price chart…
vs 52W High
-16.1%
₹1,732.8 lo₹2,895.3 hi
16.1% below 52W high — weakening from peak
Stock is rolling over from its 52W high. Stage 3 distribution — new longs are high risk here.
Stage Maturity
Week 6
1w13w26w
Week 6 — distribution, avoid new longs
How long this stock has been in Stage 3 distribution. Longer tops often precede deeper Stage 4 declines.
vs 200 DMA
2.5%
200 DMA: ₹2,370.8 · rising
Stock is losing its 200 DMA. Once lost, it confirms Stage 4 risk. This is a major red flag for existing holders.
Rel Volume
0.41x
vs 50-day avg
Volume spikes on down days during Stage 3 signal distribution — institutions are exiting. A clear warning to avoid new longs.
Trend Health
↓
MA20 rolling over · -0.7% vs MA50 -3.3%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
+5.3%
3M
-5.2%
6M
+26.6%
YTD
+4.4%
1Y
-9.5%
Sector
Industrials
↓ Peaking
Stage 2%
26.3%
20d Δ
-4.2pp
1M return
-2.2%
3M return
+0.9%
Sector Stage-2 % · last 20 days
Sector has 130 Stage 2 leaders. See Industrials Stage 2 →
Industry
Construction & Engineering
→ Flat
Stage 2%
17.2%
20d Δ
-0.9pp
1M return
-6.0%
3M return
-6.3%
Industry Stage-2 % · last 20 days
Industry has 15 Stage 2 leaders. See Construction & Engineering Stage 2 →
Stage Cycle Timeline2023-07-11 → 2026-10-07
S2 15w
S2 19w
S2 16w
S4 16w
S2 15w
S4 23w
2023-07-112026-10-07
S1S2S3S4Setup score (0–10, dashed line at 5)
S2 15w → S3 8w → S2 19w → S3 10w → S2 16w → S3 7w → S4 16w → S1 6w → S2 15w → S3 8w → S4 23w → S1 7w → S2 10w → S3 6w current
Total tracked: 168 weeks across 14 stage runs.
Scan Membership
Prop Scan
Latest: 2026-07-13
Breakout Watch
Latest: 2026-06-15
21 appearances in last 60 days. First seen: 2024-07-19.
Stocks that stay in the scan for 13+ weeks are in the highest observed-return cohort — they keep qualifying because the structure remains intact, not by luck. Persistence in the scan is itself a quality signal.
Recent Stage Timeline
2026-10-07S3
Wk 6 · Vol 0.41x
2026-10-06S3
Wk 6 · Vol 0.33x
2026-10-05S3
Wk 6 · Vol 0.56x
2026-10-01S3
Wk 6 · Vol 0.80x
2026-09-30S3
Wk 5 · Vol 4.86x
2026-09-29S3
Wk 5 · Vol 2.66x
2026-09-28S3
Wk 5 · Vol 0.42x
2026-09-25S3
Wk 5 · Vol 0.35x
2026-09-24S3
Wk 5 · Vol 0.38x
2026-09-23S3
Wk 4 · Vol 0.35x
2026-09-22S3
Wk 4 · Vol 0.54x
2026-09-21S3
Wk 4 · Vol 1.05x
Sector Peers — Stage 2All →
SPECTRUM
wk 18 · -0.3% from hi
10.0
ROSSTECH
wk 30 · 0.0% from hi
9.6
SHIVAUM
wk 27 · -1.4% from hi
9.4
AXISCADES
wk 2 · -2.7% from hi
9.2
SAMBHV
wk 9 · -4.0% from hi
9.0
Moving averages & range
50 DMA
₹2,468.8
200 DMA
₹2,370.8
52W High
₹2,895.3
52W Low
₹1,732.8
5D Low
₹2,426
Resistance levels (recent highs)
20d High
₹2,490.5
60d High
₹2,692.9
120d High
₹2,895.3
250d High
₹2,895.3
Next resistance
+2.5%
to 20d High
P/E (TTM)
21.5
Forward 13.6
Earnings Growth (YoY)
+21.6%
Revenue +13.9%
ROE
+17.3%
Profit margin +6.0%
Dividend Yield
0.05%
P/B 3.4
About this companyIndustrials· Construction & Engineering

Power Mech Projects Limited, together with its subsidiaries, provides services in power and infrastructure sectors in India and internationally. The company engages in the erection, testing, and commissioning of boilers, turbines, and generators; balance of plant (BOP), civil works and operation and maintenance (O&M); and overhauling and renovation of thermal power plants, as well as undertakes projects in the power, hydro, railway, roads and highways, irrigation, nuclear, refinery, petrochemical, oil and gas, and steel sectors. It also provides electrical transmission and distribution; industrial construction and services for power and non-power industries; and mine development operations, as well as deals in renewable energy, such as solar parks, onshore wind, battery energy storage systems, pumped storage projects, and green hydrogen and its derivatives. In addition, the company engages in the infrastructure development, and advisory and consulting business; exploring, design and engineering, developing, operating, and working on mines; recycling of wastes generated; mining sand; mining and quarrying of river bed minerals; and installation and repair of electric power and transformer plants, as well as the constructs sewage and water treatment plants. Further, it engages in the excavation of earth and rock; separation of the ore from the waste rock; stacking and handling the waste material; monitoring environmental aspects; and provision of supporting services comprising repair shops, labs, residential quarters, warehouses, and offices, as well as software development and support services. Additionally, it manufactures components for high-capacity pumps, spare parts for hydro and thermal power plant components, components for railway electrification, and facilities and processes, as well as re-blades turbines. The company was incorporated in 1999 and is based in Hyderabad, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-07. Past data patterns are not indicative of future results. This page is a data analytics tool only.