Skip to main content
LT · Industrials · 2026-08-21

Larsen and Toubro Ltd

6.9★★ GoodSolid +0.6Stage 2 · wk 1In scan: Breakout Watch3→2 todayMARKET: BULL RISING · 2026-08-21
₹4,093
+0.29% today
₹5,63,142 Cr · Large cap
About this companyIndustrials· Construction & Engineering
Expand ▾

Larsen & Toubro Limited engages in engineering, procurement, and construction projects (EPC) in India and internationally. The company operates through four segments: Infrastructure Projects, Energy Projects, Hi-Tech Manufacturing, and Others. The Infrastructure Projects segment is involved in the engineering and construction of building and factories, transportation infrastructure, heavy civil infrastructure, power transmission & distribution, renewables, water and effluent treatment, and minerals and metals. The Energy Projects segment provides EPC solutions in clean energy space, oil & gas, refineries, petrochemicals & offshore wind energy sectors, from front-end design through detailed engineering, modular fabrication, procurement, project management, construction, installation and commissioning; CarbonLite solutions for power generation plants including power generation equipment with associated systems; and carbon capture utilization and utility packages. The Hi-Tech Manufacturing segment designs, manufactures/constructs, supplies, and revamps/retrofits custom designed engineered critical equipment and systems for the process plants, nuclear energy, and green hydrogen sectors; marine and land platforms, related equipment and systems, and aerospace products and systems; precision and electronics products and systems; and electrolysers. The other segment engages in realty; smart infrastructure and communication projects; construction equipment; and industrial product design development, including marketing and servicing of construction equipment, mining machinery and parts thereof, manufacture and sale of rubber processing machinery, and ecommerce/digital platforms and data centers. It has a strategic partnership with General Atomics Aeronautical Systems, Inc. to manufacture Medium Altitude Long Endurance (MALE) Remotely Piloted Aircraft Systems (RPAS) in India, for the Indian armed forces. The company was founded in 1938 and is headquartered in Mumbai, India.

Visit company website →
P/E (TTM)
34.7
Forward 22.0
Earnings Growth (YoY)
-34.5%
Revenue +11.7%
ROE
+17.0%
Profit margin +5.5%
Dividend Yield
0.94%
P/B 5.1
vs 52W High
-7.4%
₹3,342.4 lo₹4,418.1 hi
7.4% below 52W high — pullback range
How far this stock is from its 52-week high. A pullback of 3–20% while Stage 2 structure holds is typically a better entry than chasing near the high.
Stage Maturity
Week 1
1w13w26w
Week 1 — fresh breakout, verify structure
How long this stock has been in Stage 2. The sweet spot is typically 13–26 weeks — enough time to prove the structure holds, not so long it's extended. Very fresh (wk 1–4) often needs more time to confirm.
vs 200 DMA
2.9%
200 DMA: ₹3,979.5 · rising
Long-term trend anchor. When stock and Nifty are both above their 200 DMA, the macro backdrop supports continuation.
Rel Volume
0.65x
vs 50-day avg
Low vol (0.5–1x) on pullbacks = resting, not being sold. High vol on breakouts = commitment. Volume spike on down days is a warning sign.
Trend Health
↑ ⇈
Accelerating · MA20 +3.1% vs MA50 +0.6% / 10d
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
Sector
Industrials
↑ Building
Stage 2%
37.6%
20d Δ
+1.4pp
1M return
+4.5%
3M return
+8.2%
Sector Stage-2 % · last 20 days
This stock ranks #95 of 162 Stage 2 stocks in Industrials by RS.
Industry
Construction & Engineering
→ Flat
Stage 2%
27.7%
20d Δ
-0.3pp
1M return
+3.6%
3M return
+3.3%
Industry Stage-2 % · last 20 days
Ranks #9 of 22 Stage 2 stocks in this industry.
Price + Volume Chart
Loading price chart…
Stage Cycle Timeline2023-05-29 → 2026-08-21
S2 56w
S2 18w
2023-05-292026-08-21
S1S2S3S4Setup score (0–10, dashed line at 5)
S2 56w → S3 5w → S2 13w → S3 8w → S2 7w → S3 1w → S4 13w → S1 6w → S2 11w → S3 3w → S2 18w → S3 2w → S2 4w → S3 8w → S4 3w → S3 1w → S2 6w → S3 4w → S2 1w current
Total tracked: 168 weeks across 19 stage runs.
1M
+7.9%
3M
+4.2%
6M
-2.6%
YTD
+1.3%
1Y
+10.8%
Scan Membership
Breakout Watch
Latest: 2026-08-21
7 appearances in last 60 days. First seen: 2024-07-23.
Stocks that stay in the scan for 13+ weeks are in the highest observed-return cohort — they keep qualifying because the structure remains intact, not by luck. Persistence in the scan is itself a quality signal.
Recent Stage Timeline
2026-08-21S23→2
Wk 1 · Vol x
2026-08-20S3
Wk 5 · Vol x
2026-08-19S3
Wk 5 · Vol x
2026-08-18S3
Wk 5 · Vol x
2026-08-17S3
Wk 4 · Vol x
2026-08-14S3
Wk 4 · Vol x
2026-08-13S3
Wk 4 · Vol x
2026-08-12S3
Wk 4 · Vol x
2026-08-11S3
Wk 4 · Vol x
2026-08-10S3
Wk 3 · Vol x
2026-08-07S3
Wk 3 · Vol x
2026-08-06S3
Wk 3 · Vol x
Sector Peers — Stage 2All →
MARINE
wk 13 · -0.3% from hi
9.8
RATNAVEER
wk 14 · -0.8% from hi
9.8
UNIVCABLES
wk 14 · -8.7% from hi
9.4
TIIL
wk 13 · 0.0% from hi
9.3
RKFORGE
wk 3 · -2.4% from hi
9.2
Moving averages & range
50 DMA
₹4,010.7
200 DMA
₹3,979.5
52W High
₹4,418.1
52W Low
₹3,342.4
5D Low
₹4,041.3
Resistance levels (recent highs)
20d High
₹4,093
60d High
₹4,216.4
120d High
₹4,298.5
250d High
₹4,418.1
Next resistance
+3.0%
to 60d High

All analytics based on EOD data. Data as of 2026-08-21. Past data patterns are not indicative of future results. This page is a data analytics tool only.