Skip to main content
TITAGARH· Industrials› Rail

Titagarh Rail Systems Ltd

Stage 3 · Topping · week 7

As of 16 Oct 2026, Titagarh Rail Systems is in Stage 3 — topping, where an uptrend loses steam, in week 7 (since 31 Aug 2026). It closed at ₹749, 19.7% below its 52-week high and below its 200-day average, which is rising. In Industrials, 25.5% of stocks are in Stage 2.

Titagarh Rail Systems Limited engages in the manufacture and sale of freight and passenger rail systems in India and internationally. More about the company

₹749.2
+0.09% today
₹10,089 Cr · Mid cap
Market Neutral — FadingIndustrials 25.5% in Stage 2-2.0 pts / 20dRail 50.0%+16.7 pts

Pro read

Pro

Our read

Topping — the uptrend is tiring

Setup score

—

Momentum

Steady

Edge

—

Is TITAGARH early, or has it already run? Pro answers that for every NSE stock, after every close.

Loading price chart…
vs 52W High
-19.7%
₹574.9 lo₹932.6 hi
19.7% below 52W high — weakening from peak
Stock is rolling over from its 52W high. Stage 3 distribution — new longs are high risk here.
Stage Maturity
Week 7
1w13w26w
Week 7 — distribution, avoid new longs
How long this stock has been in Stage 3 distribution. Longer tops often precede deeper Stage 4 declines.
vs 200 DMA
-5.9%
200 DMA: ₹796.2 · rising
Stock is losing its 200 DMA. Once lost, it confirms Stage 4 risk. This is a major red flag for existing holders.
Rel Volume
1.03x
vs 50-day avg
Volume spikes on down days during Stage 3 signal distribution — institutions are exiting. A clear warning to avoid new longs.
Trend Health
↓
MA20 rolling over · -4.6% vs MA50 -1.9%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-7.9%
3M
-12.9%
6M
+1.6%
YTD
-8.2%
1Y
-16.7%
Sector
Industrials
↓ Peaking
Stage 2%
25.5%
20d Δ
-2.0pp
1M return
-0.9%
3M return
-2.5%
Sector Stage-2 % · last 20 days
Sector has 125 Stage 2 leaders. See Industrials Stage 2 →
Industry
Rail
↑ Building
Stage 2%
50.0%
20d Δ
+16.7pp
1M return
-3.1%
3M return
+2.1%
Industry Stage-2 % · last 20 days
Industry has 3 Stage 2 leaders. See Rail Stage 2 →
Stage Cycle Timeline2023-07-20 → 2026-10-16
S2 32w
S2 17w
S4 18w
S4 21w
2023-07-202026-10-16
S1S2S3S4Setup score (0–10, dashed line at 5)
S2 32w → S3 10w → S2 17w → S3 8w → S4 6w → S1 3w → S4 18w → S1 11w → S4 9w → S3 1w → S2 5w → S3 3w → S4 21w → S1 6w → S2 9w → S3 7w current
Total tracked: 168 weeks across 16 stage runs.
Scan Membership
Prop Scan
Latest: 2026-07-21
Breakout Watch
Latest: 2026-06-24
19 appearances in last 60 days. First seen: 2024-05-13.
Stocks that stay in the scan for 13+ weeks are in the highest observed-return cohort — they keep qualifying because the structure remains intact, not by luck. Persistence in the scan is itself a quality signal.
Recent Stage Timeline
2026-10-16S3
Wk 7 · Vol 1.03x
2026-10-15S3
Wk 7 · Vol 0.55x
2026-10-14S3
Wk 7 · Vol 0.54x
2026-10-13S3
Wk 6 · Vol 0.64x
2026-10-12S3
Wk 6 · Vol 0.55x
2026-10-09S3
Wk 6 · Vol 0.39x
2026-10-08S3
Wk 6 · Vol 0.64x
2026-10-07S3
Wk 6 · Vol 0.40x
2026-10-06S3
Wk 5 · Vol 0.50x
2026-10-05S3
Wk 5 · Vol 0.73x
2026-10-01S3
Wk 5 · Vol 0.75x
2026-09-30S3
Wk 5 · Vol 1.92x
Sector Peers — Stage 2All →
LOKESHMACH
wk 28 · -8.0% from hi
8.9
SHREEJISPG
wk 17 · 0.0% from hi
8.4
SHIVAUM
wk 28 · 0.0% from hi
8.4
ROSSTECH
wk 31 · -6.1% from hi
8.2
SPECTRUM
wk 19 · -3.3% from hi
8.2
Moving averages & range
50 DMA
₹825.5
200 DMA
₹796.2
52W High
₹932.6
52W Low
₹574.9
5D Low
₹748.5
Resistance levels (recent highs)
20d High
₹842.1
60d High
₹896.5
120d High
₹932.6
250d High
₹932.6
Next resistance
+12.4%
to 20d High
P/E (TTM)
62.9
Forward 29.6
Earnings Growth (YoY)
-23.2%
Revenue -7.8%
Dividend Yield
0.12%
P/B 4.5
About this companyIndustrials· Rail

Titagarh Rail Systems Limited engages in the manufacture and sale of freight and passenger rail systems in India and internationally. The company offers forged wheel set, loco shells, couplers, draft gears, cast bogies, and cast manganese steel crossing products; automobile-carrying, flat, hopper, tank, box, covered, and special purpose wagons; and brake vans. It also provides passenger rolling stock products, including high speed electric loco, electric multiple unit train sets, metros, semi high-speed trains, light rail transport, diesel electric multiple units, body shells, and bogies; and propulsion and electrical equipment, such as traction converters and power electronics, propulsion systems, auxiliary power supply products, electronic equipment, traction motors, train control and monitoring systems, and hardware and software products. In addition, the company offers maintenance, assistance and global, repair, inspection and refurbishing, systems and electrical equipment upgrade, exteriors and interiors face-lift, and power upgrading services. Further, it engages in the shipbuilding business comprising coastal research vessels, naval vessels, passenger ships, tugs, and inland water transport vessels. Additionally, the company manufactures modular panel bridges, bailey bridges, unibridges, and matière X bridges; and defense products, such as shelters, specialized wagons, EMI/EMS containers, CBRNe equipment, mine ploughs, pressure vessels, and specialized canopies. The company was formerly known as Titagarh Wagons Limited and changed its name to Titagarh Rail Systems Limited in May 2023. Titagarh Rail Systems Limited was incorporated in 1997 and is based in Kolkata, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-16. Past data patterns are not indicative of future results. This page is a data analytics tool only.