Skip to main content

Power and Instrumentation (Gujarat) Ltd

Stage 4 · Declining · week 6

As of 16 Oct 2026, Power and Instrumentation (Gujarat) is in Stage 4 — declining, a downtrend, in week 6 (since 7 Sep 2026). It closed at ₹94.52, 47.1% below its 52-week high and below its 200-day average, which is falling. In Utilities, 9.7% of stocks are in Stage 2.

Power & Instrumental (Gujarat) Limited engages in electrical contract work business and deals in electrical equipment in India. More about the company

₹94.5
+2.93% today
₹200 Cr · Micro cap
Market Neutral — FadingUtilities 9.7% in Stage 2-4.8 pts / 20dPower Infrastructure 28.6%0.0 pts

Pro read

Pro

Our read

Declining — below its long-term trend

Setup score

—

Momentum

Steady

Edge

—

Is PIGL early, or has it already run? Pro answers that for every NSE stock, after every close.

Loading price chart…
vs 52W High
-47.1%
₹90.2 lo₹178.7 hi
47.1% below 52W high — deep Stage 4 damage
In Stage 4, distance from the 52W high reflects ongoing decline — not a discount. Avoid catching falling knives.
Stage Maturity
Week 6
1w13w26w
Week 6 — early Stage 4 decline
How long this stock has been in Stage 4 decline. The longer the downtrend, the more entrenched the selling pressure — there's no 'bottom' time to buy.
vs 200 DMA
-12.3%
200 DMA: ₹107.8 · sloping down
In Stage 4, the stock is below its 200 DMA — the hallmark of a downtrend. No long positions warranted until this reverses structurally.
Rel Volume
0.88x
vs 50-day avg
High volume on down days in Stage 4 confirms institutional selling. Low volume bounces are typical — they lack real buyers and should not be mistaken for reversals.
Trend Health
↓
MA20 rolling over · -2.9% vs MA50 -4.8%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-7.1%
3M
-15.2%
6M
-21.3%
YTD
-26.6%
1Y
-45.7%
Sector
Utilities
↓ Peaking
Stage 2%
9.7%
20d Δ
-4.8pp
1M return
-2.2%
3M return
-10.5%
Sector Stage-2 % · last 20 days
Sector has 6 Stage 2 leaders. See Utilities Stage 2 →
Industry
Power Infrastructure
→ Flat
Stage 2%
28.6%
20d Δ
+0.0pp
1M return
+1.3%
3M return
-16.9%
Industry Stage-2 % · last 20 days
Industry has 2 Stage 2 leaders. See Power Infrastructure Stage 2 →
Stage Cycle Timeline2023-07-20 → 2026-10-16
S1 16w
S2 42w
S4 17w
2023-07-202026-10-16
S1S2S3S4Setup score (0–10, dashed line at 5)
S3 1w → S4 11w → S1 16w → S2 12w → S3 2w → S2 42w → S3 7w → S4 9w → S1 3w → S4 10w → S1 11w → S3 3w → S4 17w → S1 3w → S4 4w → S1 3w → S4 5w → S1 4w → S4 6w current
Total tracked: 167 weeks across 19 stage runs.
Scan Membership
Breakout Watch
Latest: 2024-05-02
2 appearances in last 60 days. First seen: 2024-01-29.
Stocks that stay in the scan for 13+ weeks are in the highest observed-return cohort — they keep qualifying because the structure remains intact, not by luck. Persistence in the scan is itself a quality signal.
Recent Stage Timeline
2026-10-16S4
Wk 6 · Vol 0.88x
2026-10-15S4
Wk 6 · Vol 0.22x
2026-10-14S4
Wk 6 · Vol 0.73x
2026-10-13S4
Wk 5 · Vol 0.39x
2026-10-12S4
Wk 5 · Vol 0.18x
2026-10-09S4
Wk 5 · Vol 0.48x
2026-10-08S4
Wk 5 · Vol 0.23x
2026-10-07S4
Wk 5 · Vol 0.45x
2026-10-06S4
Wk 4 · Vol 0.96x
2026-10-05S4
Wk 4 · Vol 0.39x
2026-10-01S4
Wk 4 · Vol 0.58x
2026-09-30S4
Wk 4 · Vol 0.50x
Sector Peers — Stage 2All →
QPOWER
wk 9 · -11.8% from hi
5.8
KPIL
wk 20 · -6.5% from hi
4.8
GIPCL
wk 16 · -18.6% from hi
4.4
UEL
wk 10 · -30.7% from hi
4.4
SKIPPER
wk 19 · -12.9% from hi
3.9
Moving averages & range
50 DMA
₹100.8
200 DMA
₹107.8
52W High
₹178.7
52W Low
₹90.2
5D Low
₹91.8
Resistance levels (recent highs)
20d High
₹102.6
60d High
₹112.5
120d High
₹120.3
250d High
₹171.8
Next resistance
+8.6%
to 20d High
P/E (TTM)
15.9
Forward —
Earnings Growth (YoY)
-12.9%
Revenue +45.8%
Dividend Yield
0.19%
P/B 1.5
About this companyUtilities· Power Infrastructure

Power & Instrumental (Gujarat) Limited engages in electrical contract work business and deals in electrical equipment in India. The company provides contracting based, industrial electrical, commercial electrical contractors, lighting and entertainment, and power backup and standby services. It also offers design, installation, maintenance, and repair services for energy efficient power and distribution transformers, generators, switchgear, and others. Power & Instrumental (Gujarat) Limited was founded in 1975 and is based in Ahmedabad, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-16. Past data patterns are not indicative of future results. This page is a data analytics tool only.