Skip to main content

Ramky Infrastructure Ltd

Stage 4 · Declining · week 20

As of 16 Oct 2026, Ramky Infrastructure is in Stage 4 — declining, a downtrend, in week 20 (since 3 Jun 2026). It closed at ₹270, 58.5% below its 52-week high and below its 200-day average, which is falling. In Industrials, 26.3% of stocks are in Stage 2.

Ramky Infrastructure Limited, together with its subsidiaries, provides integrated construction, infrastructure development, and management services primarily in India. More about the company

₹269.7
-0.22% today
₹1,866 Cr · Small cap
Market Neutral — FadingIndustrials 26.3% in Stage 2-1.5 pts / 20dConstruction & Engineering 16.1%+0.2 pts

Pro read

Pro

Our read

Declining — below its long-term trend

Setup score

—

Momentum

Steady

Edge

—

Is RAMKY early, or has it already run? Pro answers that for every NSE stock, after every close.

Loading price chart…
vs 52W High
-58.5%
₹265.8 lo₹649.5 hi
58.5% below 52W high — deep Stage 4 damage
In Stage 4, distance from the 52W high reflects ongoing decline — not a discount. Avoid catching falling knives.
Stage Maturity
Week 20
1w13w26w
Week 20 — established downtrend
How long this stock has been in Stage 4 decline. The longer the downtrend, the more entrenched the selling pressure — there's no 'bottom' time to buy.
vs 200 DMA
-37.1%
200 DMA: ₹428.4 · sloping down
In Stage 4, the stock is below its 200 DMA — the hallmark of a downtrend. No long positions warranted until this reverses structurally.
Rel Volume
0.47x
vs 50-day avg
High volume on down days in Stage 4 confirms institutional selling. Low volume bounces are typical — they lack real buyers and should not be mistaken for reversals.
Trend Health
↓
MA20 rolling over · -9.3% vs MA50 -10.2%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-13.5%
3M
-29.8%
6M
-47.3%
YTD
-51.5%
1Y
-57.7%
Sector
Industrials
↓ Peaking
Stage 2%
26.3%
20d Δ
-1.5pp
1M return
-0.9%
3M return
-2.4%
Sector Stage-2 % · last 20 days
Sector has 129 Stage 2 leaders. See Industrials Stage 2 →
Industry
Construction & Engineering
→ Flat
Stage 2%
16.1%
20d Δ
+0.2pp
1M return
-3.6%
3M return
-7.5%
Industry Stage-2 % · last 20 days
Industry has 14 Stage 2 leaders. See Construction & Engineering Stage 2 →
Stage Cycle Timeline2023-07-20 → 2026-10-16
S2 31w
S4 18w
S2 20w
S4 19w
2023-07-202026-10-16
S1S2S3S4Setup score (0–10, dashed line at 5)
S2 31w → S3 7w → S4 10w → S1 2w → S4 1w → S1 5w → S2 7w → S3 13w → S4 18w → S1 10w → S2 20w → S3 5w → S4 13w → S1 5w → S4 19w current
Total tracked: 168 weeks across 15 stage runs.
Scan Membership
Breakout Watch
Latest: 2025-07-29
2 appearances in last 60 days. First seen: 2024-08-22.
A stock that keeps qualifying week after week does so because its Stage 2 structure keeps holding — staying power in the scan says more about the trend than any single appearance.
Recent Stage Timeline
2026-10-16S4
Wk 20 · Vol 0.47x
2026-10-15S4
Wk 19 · Vol 0.63x
2026-10-14S4
Wk 19 · Vol 1.05x
2026-10-13S4
Wk 19 · Vol 1.08x
2026-10-12S4
Wk 19 · Vol 0.75x
2026-10-09S4
Wk 19 · Vol 0.65x
2026-10-08S4
Wk 18 · Vol 1.02x
2026-10-07S4
Wk 18 · Vol 0.78x
2026-10-06S4
Wk 18 · Vol 0.63x
2026-10-05S4
Wk 18 · Vol 0.68x
2026-10-01S4
Wk 18 · Vol 4.01x
2026-09-30S4
Wk 17 · Vol 4.03x
Sector Peers — Stage 2All →
BHAGYANGR
wk 25 · 0.0% from hi
9.8
LOKESHMACH
wk 28 · -8.0% from hi
8.9
SHIVAUM
wk 28 · 0.0% from hi
8.4
SHREEJISPG
wk 17 · 0.0% from hi
8.4
ROSSTECH
wk 31 · -6.1% from hi
8.2
Moving averages & range
50 DMA
₹334.7
200 DMA
₹428.4
52W High
₹649.5
52W Low
₹265.8
5D Low
₹265.8
Resistance levels (recent highs)
20d High
₹325.2
60d High
₹406.9
120d High
₹512.2
250d High
₹649.5
Next resistance
+20.6%
to 20d High
P/E (TTM)
14.4
Forward —
Earnings Growth (YoY)
+39.3%
Revenue +6.5%
About this companyIndustrials· Construction & Engineering

Ramky Infrastructure Limited, together with its subsidiaries, provides integrated construction, infrastructure development, and management services primarily in India. The company operates through Construction Business and Developer Business segments. It constructs water and waste water projects, such as water treatment plants, water transmission and distribution systems, elevated and ground level service reservoirs, sewage treatment plants, common effluent treatment plants, tertiary treatment plants, underground drainage systems, and lake restorations. The company also engages in the irrigation projects, including cross-drainage works, lift irrigation projects, canals, feeder channels, and barrages. In addition, it undertakes industrial construction projects comprising industrial parks, SEZs, and related industrial infrastructure works; roads and bridges projects, such as expressways, highways, bridges, flyovers, rural roads, terminals, and dedicated service corridors; commercial, residential, public, institutional, corporate buildings, mass housing projects, healthcare infrastructure, high-rise, integrated townships projects, and related infrastructure facilities, including hospitals and shopping malls; and power transmission and distribution projects comprising electricity transmission networks, substations, feeder lines, and high and low tension distribution lines. Further, the company develops various development projects based on public-private partnership comprising transportation and transportation terminals, industrial parks and industrial solutions, urban water and waste water management solutions, urban solutions, and integrated townships. Ramky Infrastructure Limited was incorporated in 1994 and is based in Hyderabad, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-16. Past data patterns are not indicative of future results. This page is a data analytics tool only.