Skip to main content

KNR Constructions Ltd

Stage 4 · Declining · week 6

As of 16 Oct 2026, KNR Constructions is in Stage 4 — declining, a downtrend, in week 6 (since 3 Sep 2026). It closed at ₹111, 42.4% below its 52-week high and below its 200-day average, which is falling. In Industrials, 26.3% of stocks are in Stage 2.

KNR Constructions Limited, together with its subsidiaries, engages in the construction, engineering, and infrastructure development activities in India. More about the company

₹111.5
-0.13% today
₹3,135 Cr · Small cap
Market Neutral — FadingIndustrials 26.3% in Stage 2-1.5 pts / 20dConstruction & Engineering 16.1%+0.2 pts

Pro read

Pro

Our read

Declining — below its long-term trend

Setup score

—

Momentum

Steady

Edge

—

Is KNRCON early, or has it already run? Pro answers that for every NSE stock, after every close.

Loading price chart…
vs 52W High
-42.4%
₹109.6 lo₹193.4 hi
42.4% below 52W high — deep Stage 4 damage
In Stage 4, distance from the 52W high reflects ongoing decline — not a discount. Avoid catching falling knives.
Stage Maturity
Week 6
1w13w26w
Week 6 — early Stage 4 decline
How long this stock has been in Stage 4 decline. The longer the downtrend, the more entrenched the selling pressure — there's no 'bottom' time to buy.
vs 200 DMA
-14.2%
200 DMA: ₹129.9 · sloping down
In Stage 4, the stock is below its 200 DMA — the hallmark of a downtrend. No long positions warranted until this reverses structurally.
Rel Volume
0.36x
vs 50-day avg
High volume on down days in Stage 4 confirms institutional selling. Low volume bounces are typical — they lack real buyers and should not be mistaken for reversals.
Trend Health
↓
MA20 rolling over · -3.8% vs MA50 -2.5%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-8.5%
3M
-9.0%
6M
-10.1%
YTD
-29.2%
1Y
-42.4%
Sector
Industrials
↓ Peaking
Stage 2%
26.3%
20d Δ
-1.5pp
1M return
-0.9%
3M return
-2.4%
Sector Stage-2 % · last 20 days
Sector has 129 Stage 2 leaders. See Industrials Stage 2 →
Industry
Construction & Engineering
→ Flat
Stage 2%
16.1%
20d Δ
+0.2pp
1M return
-3.6%
3M return
-7.5%
Industry Stage-2 % · last 20 days
Industry has 14 Stage 2 leaders. See Construction & Engineering Stage 2 →
Stage Cycle Timeline2023-07-20 → 2026-10-16
S2 15w
S3 14w
S4 69w
2023-07-202026-10-16
S1S2S3S4Setup score (0–10, dashed line at 5)
S1 7w → S2 15w → S3 12w → S2 3w → S3 2w → S4 7w → S1 1w → S2 13w → S3 14w → S4 2w → S1 1w → S2 4w → S1 1w → S4 69w → S1 8w → S4 3w → S1 1w → S4 6w current
Total tracked: 169 weeks across 18 stage runs.
Scan Membership
Breakout Watch
Latest: 2025-01-03
3 appearances in last 60 days. First seen: 2024-03-13.
A stock that keeps qualifying week after week does so because its Stage 2 structure keeps holding — staying power in the scan says more about the trend than any single appearance.
Recent Stage Timeline
2026-10-16S4
Wk 6 · Vol 0.36x
2026-10-15S4
Wk 6 · Vol 0.35x
2026-10-14S4
Wk 6 · Vol 0.33x
2026-10-13S4
Wk 6 · Vol 0.38x
2026-10-12S4
Wk 6 · Vol 0.32x
2026-10-09S4
Wk 5 · Vol 0.63x
2026-10-08S4
Wk 5 · Vol 0.46x
2026-10-07S4
Wk 5 · Vol 0.30x
2026-10-06S4
Wk 5 · Vol 0.91x
2026-10-05S4
Wk 5 · Vol 0.50x
2026-10-01S4
Wk 4 · Vol 1.22x
2026-09-30S4
Wk 4 · Vol 0.29x
Sector Peers — Stage 2All →
BHAGYANGR
wk 25 · 0.0% from hi
9.8
LOKESHMACH
wk 28 · -8.0% from hi
8.9
SHIVAUM
wk 28 · 0.0% from hi
8.4
SHREEJISPG
wk 17 · 0.0% from hi
8.4
ROSSTECH
wk 31 · -6.1% from hi
8.2
Moving averages & range
50 DMA
₹122.7
200 DMA
₹129.9
52W High
₹193.4
52W Low
₹109.6
5D Low
₹111.5
Resistance levels (recent highs)
20d High
₹124.8
60d High
₹142.7
120d High
₹142.7
250d High
₹190.9
Next resistance
+11.9%
to 20d High
P/E (TTM)
7.9
Forward 16.8
Earnings Growth (YoY)
-58.6%
Revenue -12.4%
Dividend Yield
0.19%
P/B 0.8
About this companyIndustrials· Construction & Engineering

KNR Constructions Limited, together with its subsidiaries, engages in the construction, engineering, and infrastructure development activities in India. The company provides engineering, procurement, and construction services for roads, highways, bridges and flyovers, expressways, viaducts, irrigation, urban water infrastructure management, and other projects. KNR Constructions Limited was incorporated in 1995 and is based in Hyderabad, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-16. Past data patterns are not indicative of future results. This page is a data analytics tool only.