Skip to main content

HEC Infra Projects Ltd

Stage 4 · Declining · week 2

As of 16 Oct 2026, HEC Infra Projects is in Stage 4 — declining, a downtrend, in week 2 (since 7 Oct 2026). It closed at ₹114, 24.1% below its 52-week high and below its 200-day average, which is falling. In Industrials, 26.3% of stocks are in Stage 2.

HEC Infra Projects Limited operates as an engineering, procurement, and construction (EPC) contractor for electro-mechanical and instrumentation projects in India. More about the company

₹113.9
-0.74% today
₹123 Cr · Micro cap
Market Neutral — FadingIndustrials 26.3% in Stage 2-1.5 pts / 20dElectrical Components & Equipments 37.2%+2.3 pts

Pro read

Pro

Our read

Declining — below its long-term trend

Setup score

—

Momentum

Steady

Edge

—

Is HECPROJECT early, or has it already run? Pro answers that for every NSE stock, after every close.

Loading price chart…
vs 52W High
-24.1%
₹95.9 lo₹150.1 hi
24.1% below 52W high — ongoing decline
In Stage 4, distance from the 52W high reflects ongoing decline — not a discount. Avoid catching falling knives.
Stage Maturity
Week 2
1w13w26w
Week 2 — early Stage 4 decline
How long this stock has been in Stage 4 decline. The longer the downtrend, the more entrenched the selling pressure — there's no 'bottom' time to buy.
vs 200 DMA
-6.3%
200 DMA: ₹121.6 · sloping down
In Stage 4, the stock is below its 200 DMA — the hallmark of a downtrend. No long positions warranted until this reverses structurally.
Rel Volume
0.10x
vs 50-day avg
High volume on down days in Stage 4 confirms institutional selling. Low volume bounces are typical — they lack real buyers and should not be mistaken for reversals.
Trend Health
↓
MA20 rolling over · -2.8% vs MA50 -5.6%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-0.5%
3M
-3.9%
6M
-19.7%
YTD
-8.8%
1Y
-19.0%
Sector
Industrials
↓ Peaking
Stage 2%
26.3%
20d Δ
-1.5pp
1M return
-0.9%
3M return
-2.4%
Sector Stage-2 % · last 20 days
Sector has 129 Stage 2 leaders. See Industrials Stage 2 →
Industry
Electrical Components & Equipments
↑ Building
Stage 2%
37.2%
20d Δ
+2.3pp
1M return
-1.3%
3M return
+5.5%
Industry Stage-2 % · last 20 days
Stage Cycle Timeline2023-07-20 → 2026-10-16
S2 35w
S2 20w
S3 15w
S4 17w
2023-07-202026-10-16
S1S2S3S4Setup score (0–10, dashed line at 5)
S2 35w → S3 5w → S2 20w → S3 7w → S2 12w → S3 6w → S4 10w → S1 3w → S2 13w → S3 15w → S4 17w → S1 9w → S2 4w → S3 2w → S2 5w → S3 5w → S4 1w current
Total tracked: 169 weeks across 17 stage runs.
Scan Membership
Breakout Watch
Latest: 2026-07-28
5 appearances in last 60 days. First seen: 2024-04-24.
A stock that keeps qualifying week after week does so because its Stage 2 structure keeps holding — staying power in the scan says more about the trend than any single appearance.
Recent Stage Timeline
2026-10-16S4
Wk 2 · Vol 0.10x
2026-10-15S4
Wk 2 · Vol 0.40x
2026-10-14S4
Wk 2 · Vol 0.20x
2026-10-13S4
Wk 1 · Vol 0.43x
2026-10-12S4
Wk 1 · Vol 0.10x
2026-10-09S4
Wk 1 · Vol 0.92x
2026-10-08S4
Wk 1 · Vol 0.27x
2026-10-07S43→4
Wk 1 · Vol 0.48x
2026-10-06S3
Wk 5 · Vol 0.26x
2026-10-05S3
Wk 5 · Vol 0.14x
2026-10-01S3
Wk 4 · Vol 0.23x
2026-09-30S3
Wk 4 · Vol 0.01x
Sector Peers — Stage 2All →
BHAGYANGR
wk 25 · 0.0% from hi
9.8
LOKESHMACH
wk 28 · -8.0% from hi
8.9
SHIVAUM
wk 28 · 0.0% from hi
8.4
SHREEJISPG
wk 17 · 0.0% from hi
8.4
ROSSTECH
wk 31 · -6.1% from hi
8.2
Moving averages & range
50 DMA
₹118.9
200 DMA
₹121.6
52W High
₹150.1
52W Low
₹95.9
5D Low
₹110.6
Resistance levels (recent highs)
20d High
₹120
60d High
₹140.2
120d High
₹143.1
250d High
₹150.1
Next resistance
+5.3%
to 20d High
P/E (TTM)
11.5
Forward —
Earnings Growth (YoY)
+90.8%
Revenue +108.2%
About this companyIndustrials· Electrical Components & Equipments

HEC Infra Projects Limited operates as an engineering, procurement, and construction (EPC) contractor for electro-mechanical and instrumentation projects in India. The company offers services for transmission and substation projects, water management systems, smart lighting systems, public address systems, solar rooftops and power plants, building management systems, and air conditioning systems, as well as fire, security, and nurse calling systems; and electrification services. It serves the engineering and allied industries; textile, glass, and cement industries; chemical, pharmaceutical, and food products; steel and non-ferrous industries; petrochemical, refineries, and gas and oil sectors; commercial projects; dairy and allied industries; paint industry; hospitals; airports; real-estate developments; and utilities. HEC Infra Projects Limited was incorporated in 2005 and is based in Ahmedabad, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-16. Past data patterns are not indicative of future results. This page is a data analytics tool only.