Skip to main content

G R Infraprojects Ltd

Stage 4 · Declining · week 12

As of 16 Oct 2026, G R Infraprojects is in Stage 4 — declining, a downtrend, in week 12 (since 23 Jul 2026). It closed at ₹777, 39.3% below its 52-week high and below its 200-day average, which is falling. In Industrials, 26.3% of stocks are in Stage 2.

G R Infraprojects Limited provides civil construction services in India. More about the company

₹777.4
+0.24% today
₹7,522 Cr · Mid cap
Market Neutral — FadingIndustrials 26.3% in Stage 2-1.5 pts / 20dConstruction & Engineering 16.1%+0.2 pts

Pro read

Pro

Our read

Declining — below its long-term trend

Setup score

—

Momentum

Steady

Edge

—

Is GRINFRA early, or has it already run? Pro answers that for every NSE stock, after every close.

Loading price chart…
vs 52W High
-39.3%
₹775.5 lo₹1,279.8 hi
39.3% below 52W high — deep Stage 4 damage
In Stage 4, distance from the 52W high reflects ongoing decline — not a discount. Avoid catching falling knives.
Stage Maturity
Week 12
1w13w26w
Week 12 — established downtrend
How long this stock has been in Stage 4 decline. The longer the downtrend, the more entrenched the selling pressure — there's no 'bottom' time to buy.
vs 200 DMA
-13.7%
200 DMA: ₹900.7 · sloping down
In Stage 4, the stock is below its 200 DMA — the hallmark of a downtrend. No long positions warranted until this reverses structurally.
Rel Volume
0.29x
vs 50-day avg
High volume on down days in Stage 4 confirms institutional selling. Low volume bounces are typical — they lack real buyers and should not be mistaken for reversals.
Trend Health
↓
MA20 rolling over · -3.7% vs MA50 -4.2%
Two-layer momentum read: the glyph shows whether the 20-day MA is rising (↑/↗), flat (→), or rolling over (↓). The ⇈ flag fires when the 20-day MA is pulling away from the 50-day MA — short-term momentum building on top of the longer trend. Best when both glyphs agree.
1M
-5.1%
3M
-12.8%
6M
-12.8%
YTD
-24.5%
1Y
-37.4%
Sector
Industrials
↓ Peaking
Stage 2%
26.3%
20d Δ
-1.5pp
1M return
-0.9%
3M return
-2.4%
Sector Stage-2 % · last 20 days
Sector has 129 Stage 2 leaders. See Industrials Stage 2 →
Industry
Construction & Engineering
→ Flat
Stage 2%
16.1%
20d Δ
+0.2pp
1M return
-3.6%
3M return
-7.5%
Industry Stage-2 % · last 20 days
Industry has 14 Stage 2 leaders. See Construction & Engineering Stage 2 →
Stage Cycle Timeline2023-07-20 → 2026-10-16
S2 23w
S3 19w
S4 19w
S3 15w
S4 28w
2023-07-202026-10-16
S1S2S3S4Setup score (0–10, dashed line at 5)
S2 7w → S3 11w → S4 9w → S1 7w → S2 23w → S3 19w → S4 19w → S1 10w → S2 3w → S3 15w → S4 28w → S1 5w → S4 12w current
Total tracked: 169 weeks across 13 stage runs.
Scan Membership
Breakout Watch
Latest: 2025-07-29
2 appearances in last 60 days. First seen: 2024-03-22.
A stock that keeps qualifying week after week does so because its Stage 2 structure keeps holding — staying power in the scan says more about the trend than any single appearance.
Recent Stage Timeline
2026-10-16S4
Wk 12 · Vol 0.29x
2026-10-15S4
Wk 12 · Vol 0.59x
2026-10-14S4
Wk 12 · Vol 0.65x
2026-10-13S4
Wk 12 · Vol 1.11x
2026-10-12S4
Wk 12 · Vol 0.23x
2026-10-09S4
Wk 11 · Vol 0.34x
2026-10-08S4
Wk 11 · Vol 0.48x
2026-10-07S4
Wk 11 · Vol 0.27x
2026-10-06S4
Wk 11 · Vol 0.56x
2026-10-05S4
Wk 11 · Vol 0.49x
2026-10-01S4
Wk 10 · Vol 0.58x
2026-09-30S4
Wk 10 · Vol 0.37x
Sector Peers — Stage 2All →
BHAGYANGR
wk 25 · 0.0% from hi
9.8
LOKESHMACH
wk 28 · -8.0% from hi
8.9
SHIVAUM
wk 28 · 0.0% from hi
8.4
SHREEJISPG
wk 17 · 0.0% from hi
8.4
ROSSTECH
wk 31 · -6.1% from hi
8.2
Moving averages & range
50 DMA
₹843.2
200 DMA
₹900.7
52W High
₹1,279.8
52W Low
₹775.5
5D Low
₹775.5
Resistance levels (recent highs)
20d High
₹825.9
60d High
₹907
120d High
₹998.8
250d High
₹1,265.7
Next resistance
+6.2%
to 20d High
P/E (TTM)
9.8
Forward 9.3
Earnings Growth (YoY)
-48.7%
Revenue +9.7%
ROE
+10.1%
Profit margin +10.8%
Dividend Yield
0.53%
P/B 0.9
About this companyIndustrials· Construction & Engineering

G R Infraprojects Limited provides civil construction services in India. It operates through the Engineering, Procurement, and Construction; Built, Operate and Transfer/Annuity Projects; and Others segments. It offers engineering, procurement, construction (EPC), and project management services for roads and highways, bridges, airport runway, railways and metro, hydro and tunneling, power transmission and distribution, ropeways, logistics infrastructure, telecom and IT infrastructures. The company also constructs and develops state and national highways, bridges, culverts, flyovers, airport runways, tunnels, and rail over bridges. It also offers a range of services on a turnkey basis in railway infrastructure projects, such as civil infrastructures, including earthworks, bridges, station buildings, and facilities; new track laying and rehabilitation of existing tracks; railway electrification and power systems; and signaling and telecommunication services. In addition, the company constructs tunnels in hydropower, railways, metro rail, roads, and highways; designs, constructs, and maintains transmission lines, substations, and distribution networks; and provides multimodal logistics solutions comprising road and rail to support cargo movement and bolster. Further, it manufactures bitumen emulsion, construction chemicals, metal crash barrier, OHE MAST, road signage board, and thermoplastic paint.; and undertakes repair and maintenance of EPC and HAM projects. The company was formerly known as G.R. Agarwal Builders and Developers Limited and changed its name to G R Infraprojects Limited in August 2007. G R Infraprojects Limited was incorporated in 1995 and is headquartered in Udaipur, India.

Visit company website →

All analytics based on EOD data. Data as of 2026-10-16. Past data patterns are not indicative of future results. This page is a data analytics tool only.