Enviro Infra Engineers Ltd
As of 16 Oct 2026, Enviro Infra Engineers is in Stage 3 — topping, where an uptrend loses steam, in week 5 (since 10 Sep 2026). It closed at ₹187, 26.3% below its 52-week high and below its 200-day average, which is falling. In Utilities, 9.7% of stocks are in Stage 2.
Enviro Infra Engineers Limited engages in the design, construction, operation, and maintenance of water and wastewater treatment plants (WWTPs) and water supply scheme projects (WSSPs) for government… More about the company
Pro read
ProOur read
Setup score
Momentum
Edge
Is EIEL early, or has it already run? Pro answers that for every NSE stock, after every close.
About this companyUtilities· Water Management
Enviro Infra Engineers Limited engages in the design, construction, operation, and maintenance of water and wastewater treatment plants (WWTPs) and water supply scheme projects (WSSPs) for government authorities and bodies in India. Its WWTPs include sewage treatment plants with sewage network schemes and common effluent treatment plants; and WSSPs comprise water treatment plants with pumping stations and laying of pipelines for water supply. Enviro Infra Engineers Limited was incorporated in 2009 and is based in Delhi, India.
Visit company website →All analytics based on EOD data. Data as of 2026-10-16. Past data patterns are not indicative of future results. This page is a data analytics tool only.